Project Description
$21 Million TIC for Engineering, Procurement and Construction of the gas plant, 2x well pads and 10 km of pipeline.
- - Gas Plant with 20 MMSCFD capacity
- 2 well pads each with 3-phase separators
- 3 segments of gathering and sales pipelines at 4”, 6” and 8”.
Automation Scope:
- FactoryTalk HMI Main Process Plant with Allen Bradley PLC control system.
- Allen Bradley ControlLogix PLC wellsite Control Panel
Project Summary
Client: RESOURCEFUL PETROLEUM CANADA
Location: Canada
Total Project Capital: $21 Million

You can be sure of our professionalism, which is confirmed by numerous projects. If you are interested in cooperation, please contact us.