The station is designed to meet a design flowrate 140MMSCFD of produced gas in the DJ area.
Project Summary
Client:Occidental Petroleum
Project Name Johnstown Compressor Station
Total Project Capital $95 Million
Major equipment for the station included the following:
- Inlet slug catcher/separator vessel
- Network upgrade using Allen Bradley Stratix switch technology
- Water handling vessel
- Five (3) Hydration unit each with a design flowrate of 35MMSCFD
- Five (5) 2500BHP natural reciprocating compressor
- Five (3) BETX condenser/coalescing filter separators
- Five (3) Vapor recovery unit
- LACT Unit
- Centralize instrument air system
- Fuel gas metering skid
- Analyzer building
- Fuel gas letdown skid
- MCC building
- 720 KW generator